Site clearance is a project, not a pickup.

Shield supports safe removal, packing, transport, processing and reporting of redundant technology from offices, workplaces, retail sites and industrial environments — including multi-site programs running across several states at once.
Floor and site clearances during relocations, consolidations, refurbishments and lease exits. Workstations, monitors and swing arms, docking stations, phones, printers, comms cabinets and store rooms. Assets are tagged and logged as they are removed, then prepared for redeployment, transport or certified disposal.
Office closures and refresh programs rarely happen at one address. Engineers and logistics teams are sized to the number of sites and coordinated centrally, so a program running across several states arrives as one schedule and one set of reporting.
Point-of-sale systems, back-of-house equipment and site infrastructure across distributed store and branch networks, including staged rollouts of closures.
Clearing technology and cabling ahead of make-good obligations so the space can be handed back without surprises. This includes floor decabling and removal of equipment that was never on the asset register.
Infrastructure environments carry higher data risk and different handling requirements. Where a project includes racks, servers, storage, switches or structured cabling, it runs under our infrastructure decommissioning process.

